Fibre outage - Engineers are investigating
Our engineers have managed to restore service using an alternative location and power source
The power board have updated to say they will not be on site until 3pm at the earliest
We are sending an enginner to site to see if it is possible for us to power the equipment from an alternative source to restore service as the time frame of power restoration is currently unknown. Engineer ETA to site 20 minutes
A power outage at the Turnstile building on site is the cause of the issue. Electricians have review the issue and now await a response from the power board. As this is outside of our control we currently do not have an estimated time of resolve at the moment
No incidents reported
Full service interruption in Manchester city centre
We can confirm the service was fully operational at 1am. We are continuing to work with the supplier to understand the reasons for no prior warning and awaiting their Reason For Outage report.
Our team has managed to restore services to the affected buildings. We are continuing to work with our national fibre provider on the restoration of services via our Main Links.
We have been informed of the following works, We are working with our national fibre provider to understand the impact as no prior notice has been issued.
Activity Date 11-May-2022 21:00 to 12-May-2022 04:00 ( GMT )
Location of Maintenance: M42, Birmingham, UK
Reason: Undertaking a major diversion of fibre network due to diversionary works as a result of a scheme by National Highways around junction 6 on the M42.
No incidents reported
No incidents reported
No incidents reported
No incidents reported
We are currently investigating a performance issue on an underground cable link. Engineers are estimated to be on-site by 8 pm this evening to investigate the root cause and provide a resolution.
Issue resolved
Engineers have located a damaged cable. This has been repaired and services should now be restored. We will now monitor
Engineers are struggling to locate the issue but are continuing to investigate
Engineers have arrived on-site they are now conducting some preliminary investigations.
Our engineers are currently delayed due to inclement weather on the route. We are now estimating arrival at 8.30 pm.