All systems are operational

Stickied Incidents

22nd January 2025

Core Network Maintenance Window - ITYNERAFU001

Engineers will be completing essential Maintenance on our Network

Maintenance Reference: ITYNERAFU001

Date - 22/01/2025 00:00 - 06:00

Classification - Affected

Expected Downtime: 30 Minutes

Classification meanings:

Affected

This means that service is expected to be hard-down between the planned start and end times specified and full service impacting. Please note that a lot of the time service is restored much faster than the specified window.

Degraded

This means that service is not expected to be hard down, however, during the planned start and end times specified service may be slower than normal or you may experience performance issues.

At Risk

This means that service is not expected to be hard-down however due to the infrastructure that is being worked on, outage risk is increased.

Description Of Works:

Works are required to complete vital changes to Core Network Equipment in our primary data centre Telehouse North. This critical operation is essential to ensure the continued reliability, security, and optimal performance of our internet services.

Customers are advised not to reset their equipment during the window and to leave all equipment powered on. Services should be restored following completion however if they do not customers are advised to power off all InternetTY equipment at the wall for at least 2 minutes and then power it back on again and services should then be restored. If your service doesn't restore then please contact our support team for further assistance.

All impacted customers have been contacted via email.

Past Incidents

14th August 2023

No incidents reported

13th August 2023

No incidents reported

12th August 2023

No incidents reported

11th August 2023

Manchester Outage Manchester Burlington Square

Manchester Burlington Square is suffering a power issue to the communications equipment - we are investigating with the building management team

  • Faulty SFP optic identified and replaced. Services restoring

  • Our engineer is due to arrive within the next 10 minutes - Next update is expected at 18.30

  • We have dispatched our own engineers to the site. ETA 1.5 hours to assist in the fault diagnostics as previous fault code has now been varied by Openreach

  • Engineer allocated and investigating

  • Customer reference Burlington Square 1108 Care level Enhanced Care Fault description We have detected an issue with the power levels on the equipment for this service input to the Openreach equipment. Fault has been reported and await engineer allocation. Next update will be once an engineer has been allocated.

  • 10th August 2023

    No incidents reported

    9th August 2023

    No incidents reported

    8th August 2023

    No incidents reported