All systems are operational

Stickied Incidents

22nd January 2025

Core Network Maintenance Window - ITYNERAFU001

Engineers will be completing essential Maintenance on our Network

Maintenance Reference: ITYNERAFU001

Date - 22/01/2025 00:00 - 06:00

Classification - Affected

Expected Downtime: 30 Minutes

Classification meanings:

Affected

This means that service is expected to be hard-down between the planned start and end times specified and full service impacting. Please note that a lot of the time service is restored much faster than the specified window.

Degraded

This means that service is not expected to be hard down, however, during the planned start and end times specified service may be slower than normal or you may experience performance issues.

At Risk

This means that service is not expected to be hard-down however due to the infrastructure that is being worked on, outage risk is increased.

Description Of Works:

Works are required to complete vital changes to Core Network Equipment in our primary data centre Telehouse North. This critical operation is essential to ensure the continued reliability, security, and optimal performance of our internet services.

Customers are advised not to reset their equipment during the window and to leave all equipment powered on. Services should be restored following completion however if they do not customers are advised to power off all InternetTY equipment at the wall for at least 2 minutes and then power it back on again and services should then be restored. If your service doesn't restore then please contact our support team for further assistance.

All impacted customers have been contacted via email.

Past Incidents

6th May 2024

No incidents reported

5th May 2024

No incidents reported

4th May 2024

No incidents reported

3rd May 2024

Copperas House / The Exchange Student Accommodation

We are investigating reports of loss of service at Copperas House and the exchange student accommodation. Updates to follow

  • Services restored. Services are no longer considered at risk of failure. If you are still without service please contact our support team for assistance

  • We are seeing services restore across all sites impacted by the power cut. Services considered at risk whilst we monitor service restoration

  • Update from SP Energy:

    The estimated restoration time has been amended:

    "Estimated restored time: 03/05/2024 18:00"

  • Update from SP Energy:

    "Estimated restored time: 03/05/2024 21:00"

    We are hoping for a much faster resolution time.

  • The power issue has been identified as an issue relating to SP Energy.

    Please see details of their outage below:

    "There is a power cut affecting the L1, L3 & L7 postcode areas of Liverpool. Our engineers are enroute to find and fix the fault as quickly and as safely as possible. We expect your electricity supply to be restored by 4 pm . If you require any further help or support, please call us on 105.The latest updates can be found on our website www.spenergynetworks.co.uk. We apologise for the inconvenience and thank you for your patience.

    Postcodes affected:

    *******, L1, L130BQ, L19AS, L19AX, L19BD, L19BH, L19BQ, L19BX, L19BY, L19DE, L19EF, L19HZ, L19JG, L315TQ, L35, L35RF, L35SR, L35TB, L35TF, L35TQ, L35XF, L35YD, L697ZX, L77BJ, L77BL, L77BP, L77DL, L77DN, L77DP, L77EA, L77EE, L77EJ, L77HA, L77JB, L93ES"

    Reference Number: INCD-2177510-i Estimated restored time: 03/05/2024 15:57

  • The issue has been diagnosed as a loss of power to Network Equipment servicing these buildings. We are currently working with people on-site to find the route cause of the power issue. Updates to follow

  • 2nd May 2024

    No incidents reported

    1st May 2024

    No incidents reported

    30th April 2024

    No incidents reported