Due to a local substation fire our main building in Lincolnshire lost full power. This was isolated by the emergency services. Due to the nature of this also tripped surged our automatic transfer switch system for safety. Our team have now restored power using Alternative Power Generators to enable service to continue. The on-site team are working with the fire services to implement a safe return to electrical services at this time. Services still remain at risk, however our team will remain on-site throughout the ensure service is maintained.