Our monitoring and customer reports indicate a full loss of service to the Manchester Burlington Square Site. Our team are investigating. Updates to follow
Latest update from the Third Party Supplier:
The engineer has replaced the SFP at the exchange, but we are still seeing the circuit down.
Our field engineering team are now planning for additional testing. Further updates to follow.
Engineer has replaced the SFP and fibre patching on site. Unfortunately, the issue still persists.
The engineer is now heading to the local exchange for further checks. ETA is around 20mins.
Engineers have just arrived on site. They will head to the main communications area shortly and begin initial diagnostics.
Latest Update from the Third-Party Supplier:
An engineer has now been allocated to the job. ETA: 1hr 30mins
The third-party supplier has indicated that engineers will need to attend. Awaiting engineer allocation. ETA to site within 4 hours.
Investigations and diagnostics have confirmed that the issue is with third-party connectivity to the Site. We have raised a Fault with the provider of the connectivity and are awaiting their updates. We will continue to update this incident as and when we have updates to provide.
Working with the concierge on site, we have now validated that there is power to our equipment. We are currently attempting remote diagnostics and troubleshooting. We will provide a further update as soon as possible
We are currently liaising with concierge teams on site to validate power to our equipment. We will provide an update as soon as possible